Client
HSE/Beaumont Hospital
Architect
Scott Tallon Walker Architects
Main Contractor
Elliot Group
Consultant
Black & White Engineers
J Vaughan Electrical Contractors Ltd. is proud to have successfully delivered the electrical services installation for the new state-of-the-art Cystic Fibrosis In-Patient Unit at Beaumont Hospital, Dublin.
This landmark healthcare development provides a purpose-built, 20-bedroom specialist inpatient facility, designed to enhance the standard of care, comfort and treatment available to people living with cystic fibrosis. Extending to approximately 1,990 sqm across three levels, the new unit represents a significant investment in specialist healthcare infrastructure and an important addition to the Beaumont Hospital campus.
Delivered within a fully operational hospital campus, the project required careful planning, close coordination and a strong commitment to safety, quality and reliability. JVE Team worked collaboratively alongside the wider construction and design teams to ensure the successful delivery of the electrical installation, while respecting the demanding operational requirements of a live healthcare setting.
The new facility has been designed to provide a modern, dedicated clinical environment that supports specialist patient care, improved infection control and the day-to-day needs of patients and healthcare professionals.
JVE is delighted to have contributed to the successful delivery of this important healthcare project, which will have a lasting positive impact on cystic fibrosis care in Ireland. We extend our thanks to Elliott Group, Beaumont Hospital and the wider project team for their collaboration and commitment throughout the project.


